Project Gallery

(Some projects may include BEFORE & AFTER photos)

Project Description

This project was challenging as we had to extend the current bathroom into a back room that appeared to be an extension to the property; this involved breaking through an external wall and installing an RSJ. Since the master bathroom was located on the first floor it introduced some limits to the extended part of the bathroom. We suggested a nice solution of having a shower cubical in there that worked perfectly well.

Despite the extension, the bathroom was still fairly narrow and we had to install a 1500mm bath in order for it to fit. Overall, the customer was so happy and impressed that we ended up renovating the whole property.

This project involved the following specialist and skills: bathroom designer, bathroom fitter, RJS (load bearing beam) installers, flooring specialist, carpenter, tiler, plumber, plasterer, electrician, painter and decorator services. It was completed in Wavendon  in Milton Keynes in 2014.

LOOK – at the images
LISTEN – to our customer’s opinion their own projects – CLICK HERE
TALK – to us about your own project

We aim to respond to all enquiries within 24 hours during the weekdays
Get in touch on-line