Big project in Furzton-14

Project Gallery

(Some projects may include BEFORE & AFTER photos)

Project Description

This project was carried out as part of a large property renovation.

We have completely redesigned the master bathroom by creating a new door into  the  master bathroom and blocking one of the existing ones, moved all the plumbing to the required locations, new electrics etc.

The bathroom has two doors and we introduced electronic locking system with indications and safety features so that both doors would lock automatically when the bathroom is in use.

The bathroom has many other features like built-in-wall cabinet, solid surface with built-in lights, extra LED lights in the shower area, walking-in shower with easy controls etc.

It was completed in 2017.

LOOK – at the images
LISTEN – to our customer’s opinion their own projects – CLICK HERE
TALK – to us about your own project

We aim to respond to all enquiries within 24 hours during the weekdays
Get in touch on-line