Project 1

Project Description
This was actually the last project we completed for Meera. It all started with a master bathroom renovation (see below) but it turned out to be a very big project indeed. In total we carried out the following projects: master bathroom renovation, cloakroom re-design, major kitchen renovation, garage conversion, en-suite renovation and many other smaller jobs in between the main projects.
On this project we converted part of a single garage into a studio for Meera. The other part was kept for normal use.
All projects involved the following specialist and skills: builders, bricklayers, insulation specialist, air conditioning specialists, glazing specialists, kitchen and bathroom designer, kitchen fitter, bathroom installer, under-floor heating specialist, carpenter, tiler, plumber, plasterer, electrician, furniture designer and furniture installer, painter and decorator services. They were completed in 2016.
Project 2

Project Description
Meera contacted us via our website Contact Us form. She had just bought the house and wanted a fair amount of work carried out. Having received three quotes for the required work that originally included a master bathroom, bedroom and cloakroom renovation we ended up being the most expensive; her reason for choosing us is her own words was: “You advised me on a lot things offering different, more cost effective solutions whereas other builders just took a note on what I wanted. You seemed to be very knowledgeable in what you do and I do not mind paying extra to make sure I get a proper job and a good service.”
In this project we had to strip everything back in the bathroom as we normally do, including the ceiling. We supplied and installed an in-wall shower, P-shape bath and LED lights. We also advised the customer on anti-slip floor tiles taking into consideration two small children in the house. Everything was installed and the room was fully tiled, incorporating feature tiles on the wall.
Project 3

Project Description
The cloakroom had one major challenge – located in the middle of the house we had to find a way to provide mechanical extraction to the outside and that we have done. We also re-built the under-stairs cupboard, introducing lights and shelving there.
Project 4

Project Description
Renovating the kitchen was a big project. There were so many aspects to the work that it was not a simple kitchen renovation. Our work included the following:
- replacing and moving the fuse board
- replacing the back door
- moving drainage
- creating provisions for a future garage conversion
- new electrics including under-floor heating
- moving the boiler to a nearside wall to accommodate the new kitchen layout
- floor levelling, plastering, painting
- kitchen design, supply and fitting including quartz worktops
The original kitchen looked OK on the photos but was actually in a poor state. When Meera moved into the house and started using the kitchen she noticed many things that were either fixed in a hurry or had never been finished after the original installation. She particularly disliked the sink in the middle of the room. Meera told us she wanted a completely different kitchen – and that’s what we gave her. She was very happy with our work.
LOOK – at the images and video
LISTEN – to our customer’s opinion of this project (click on the video)
TALK – to us about your own project
We aim to respond to all enquiries within 24 hours during the weekdays
Get in touch on-line